General

PLEX Construction Site Update

Beginning next week (week of September 5), perimeter fencing will be put into place on the east side of the PLEX. The fencing will be located along Ray Street and prevent entry/exit through the east door of the building. The main entrance doors at the front of the building will still be accessible. Please be sure to take note of directional signage and stay out of restricted/fenced areas.

 

Posted By: Russ Degitz, Chief Operating Officer