General

HUB Update

HUB progress has continued moving along in very noticeable ways. This week, the Mall concrete is being removed in front of the HUB in preparation for the new sidewalk. Additionally, more internal framing has been added and some site development has begun on the west side of the building. Pictured (from top left and moving clockwise): site prep on the west side of the building; first floor staging with materials; second floor framing for the Bookstore; demolition and removal of the Mall concrete.

Posted By: Russ Degitz